Allen Edwards Primary School is a primary school in Lambeth, London.
Sector: Education
Location: Stockwell, London
Main Contractor: Galliford Try
Middlesex Scope: Drylining and Firestopping Works
NEXT PHOTO
SECTOR: EDUCATION
Allen Edwards School’s original buildings no longer met the requirements of a modern learning environment. A new three-storey school was constructed on the existing playground areas, allowing the school to remain operational throughout the build. Once the new building was completed and occupied, the original school buildings were demolished and the area was reinstated as new playground space.
Middlesex was appointed to deliver the firestopping works within the new building, providing and installing passive fire and acoustic stopping to all compartmentation lines, including walls, floors, risers and service penetrations. Fire sealing was carried out around all mechanical, electrical, plumbing and hydraulic services using approved, tested systems to achieve the required fire resistance and acoustic performance.
In keeping with Middlesex’s quality and safety focus, installations complied with all relevant standards, approved details, and manufacturer’s instructions.
Middlesex was also appointed to deliver the drylining works.